Demo cases
On this page, you will find a few examples of what you can expect to get from our application. Click on on them to check them out!
Demo case #1
The first demo case contains the following parameters:
-
Base information
- Based on Switzerland's consumption in 2018 Extra consumption due to electrification of mobility and build heating (heat-pumps)
- Using electric mobility and heat pumps
- Avoiding nuclear power
- Installed photovoltaic power: 50 GWp
- Installed battery capacity: 50 GWh
Demo case #2
The second demo case contains the following parameters:p>
-
Base information
- Based on Switzerland's consumption in 2018 Extra consumption due to electrification of mobility and build heating (heat-pumps)
- Using electric mobility and heat pumps
- Avoiding nuclear power
- Installed photovoltaic power: 50 GWp
- Installed battery capacity: 50 GWh
-
A complete hydrogen chain with
- 20.7 GW of installed electrolysis power
- A hydrogen storage with a 12.41 TWh capacity
- 6.76 GW of installed fuel-cell power
Demo case #3
The third demo case contains the following parameters:p>
-
Base information
- Based on Switzerland's consumption in 2018 Extra consumption due to electrification of mobility and build heating (heat-pumps)
- Using electric mobility and heat pumps
- Avoiding nuclear power
- Installed photovoltaic power: 50 GWp
- Installed battery capacity: 50 GWh
-
A complete hydrogen chain with
- 21.83 GW of installed electrolysis power
- A hydrogen storage with a 13.98 TWh capacity
- 6.7 GW of installed fuel-cell power
- Installed wind power: 5.21 GW
Demo case #4
The fourth demo case contains the following parameters:
-
Base information
- Based on Switzerland's consumption in 2018 Extra consumption due to electrification of mobility and build heating (heat-pumps)
- Using electric mobility and heat pumps
- Avoiding nuclear power
- Installed photovoltaic power: 88 GWp
- Installed battery capacity: 50 GWh
-
A complete hydrogen chain with
- 43.55 GW of installed electrolysis power
- A hydrogen storage with a 26 TWh capacity
- 8.72 GW of installed fuel-cell power
Demo case #5
The fifth demo case contains the following parameters:p>
-
Base information
- Based on Switzerland's consumption in 2018 Extra consumption due to electrification of mobility and build heating (heat-pumps)
- Using electric mobility and heat pumps
- Avoiding nuclear power
- Installed photovoltaic power: 58.2 GWp
- Installed battery capacity: 50 GWh
-
A complete hydrogen chain with
- 31.6 GW of installed electrolysis power
- A hydrogen storage with a 18.98 TWh capacity
- 7.52 GW of installed fuel-cell power
- Installed wind power: 10.0 GW
Demo case #6
The sixth demo case contains the following parameters:p>
-
Base information
- Based on Switzerland's consumption in 2018 Extra consumption due to electrification of mobility and build heating (heat-pumps)
- Using electric mobility and heat pumps
- Avoiding nuclear power
- Installed photovoltaic power with focus on winter production: 53 GWp
- Installed battery capacity with: 50 GWh
-
A complete hydrogen chain with
- 46 GW of installed electrolysis power
- A hydrogen storage with a 13.29 TWh capacity
- 9.29 GW of installed fuel-cell power
- Installed wind power with wind turbines of latest generation: 7 GWp